Mercedes-Benz U.S. International
Plant Expansion
Vance, Alabama
We served as Construction Manager for this multi-year expansion. This allowed MBUSI to begin building C-Class vehicles, in addition to M, R, and GL-Class vehicles, which were already being produceds. The expansion increased overall production to more than 200,000 vehicles annually.
The scope of this project totaled more than 1,500,000 square-feet, including the following building measures:
- Paint Shop Expansion – 228,000 square-feet
- Body Shop Expansion – 135,000 square-feet
- Body Shop Retrofit – 210,000 square-feet
- ASRS Expansion – 22,000 square-feet
- Assembly Shop Retrofit – 613,000 square-feet
- North Assembly Shop Expansion – 45,150 square-feet
- South Assembly Shop Expansion – 25,000 square-feet
- CMM Addition – 8,800 square-feet
- Infrastructure improvements and upgrades plant-wide